The sanctuary takes out a $12,500 loan to renovate its gift shop. At 5%
simple interest, how much would the sanctuary need to pay back in total after 10 years?
Answer:
20361.18283
Step-by-step explanation:
p(1+r/100)n
12500(1+5/100)power 10
i hope this answer helps a little bit.
IM GIVING 20 POINTS
What is the area of a square with side lengths of 3/5 units?
15/15
9/25
6/10
3/5
Answer:
you get 9/25
Step-by-step explanation:
formula for area of square
=s^2
plug in
3/5^2
calculate
you get 9/25
Hey there!
To find the area of a square, multiply the side length by itself, also known as sqaring the side length.
We must solve 3/5 x 3/5.
3/5 x 3/5 = 0.36
The units we'll use is because units are the unt we're given, and it is squared because it is the area of a shape.
Your final answer is 0.36 .
Hope this helps!
HELP HELP PLEASE!! D:
Determine the missing side length!!
PLEASE NO CAP!!
Answer:
missing side length = 9
Step-by-step explanation:
[tex]c^{2} = a^{2} + b^{2}[/tex]
a = 6
b = 7
c = missing side
[tex]c^{2} = 6^{2} + 7^{2}[/tex]
[tex]c^{2} = 36 + 49[/tex]
[tex]c^{2} = 85[/tex]
[tex]\sqrt{c^{2} } = \sqrt{85}[/tex]
[tex]c = 9.219 = 9[/tex]
The circumference of a tree trunk is 50 ft
Answer:
So the length will be the same as the length of the torso
What is:
(9t+5)+(3t-6)
simplified?
Answer:
12t - 1
Step-by-step explanation:
(9t+5) + (3t-6)
9t + 5 + 3t - 6
12t - 1
The results of a series of surveys revealed a population with a mean of 4.73 and a standard deviation of 0.865. If each survey has a sample size of 200, which value falls within the interval where 95% of the sample means occur? A. 4.88 B. 4.63 C. 4.91 D. 4.55
Answer:
4.63
Please give me brainliest, I really need it.
The value of 4.63 falls within the interval (4.66, 4.791) where 95% of the sample means occur option (B) is correct.
What is a confidence interval for population standard deviation?It is defined as the sampling distribution following an approximately normal distribution for known standard deviation.
The formula for finding the confidence interval for population standard deviation as follows:
[tex]\rm s\sqrt{\dfrac{n-1}{\chi^2_{\alpha/2, \ n-1}}} < \sigma < s\sqrt{\dfrac{n-1}{\chi^2_{1-\alpha/2, \ n-1}}}[/tex]
Where s is the standard deviation.
n is the sample size.
[tex]\chi^2_{\alpha/2, \ n-1} and \chi^2_{1-\alpha/2, \ n-1}[/tex] are the constant based on the Chi-Square distribution table.
α is the significance level.
σ is the confidence interval for population standard deviation.
Calculating the confidence interval for population standard deviation:
We know significance level = 1 - confidence level
It is given that:
Mean of the population x = 4.73
Standard deviation s = 0.865
Sample size n = 200
The interval where 95% of the sample means occur:
Lower limit = 4.73 - 0.865/√200
Lower limit = 4.66
Upper limit = 4.73 + 0.865/√200
Upper limit = 4.791
The interval = (4.66, 4.791)
Thus, the value of 4.63 falls within the interval (4.66, 4.791) where 95% of the sample means occur option (B) is correct.
Learn more about the confidence interval here:
brainly.com/question/6654139
#SPJ2
Anyone know the answer to this ?
Answer:
no srry
Step-by-step explanation:
What is the length of one side of a cube that has a surface area of 1,734 square mm?
Answer:
a = 17
Step-by-step explanation:
1,734 = 6a^2
1,734/6 = 6a^2/6
[tex]\sqrt{289}[/tex] = [tex]\sqrt{a^2}[/tex]
a = 17
Answer:
side = 17 mm
Step-by-step explanation:
1734/6 = 289
√289 = 17 mm
Isabella has 63 hair bows. Isabella's sister has h more hair bows than Isabella. Choose the expression that shows how many hair bows Isabella's sister has.
Answer:
(h+63)
Step-by-step explanation:
Given that,
Isabella has 63 hair bows.
Isabella's sister has h more hair bows than Isabella. It means,
Isabella's sister = h+63
h and 63 are added as Isabella's sister has h more hair bows than Isabella.
Hence, the expression would be (h+63).
What is the data range of the data below 625, 638, 619, 677, 638, 659
Answer:
58
Step-by-step explanation:
The range is the difference between the highest and the lowest numbers in the number set.
The highest number in this set is 677 and the lowest number is 619.
677 - 619 = 58
A line passes through the point (8, 7) and has a slope of 5/4 Write an equation in slope-intercept form for this line.
44 students decided to take a cupcake, and 33 of them picked vanilla. What percentage of the students picked
Answer:
33.33%
Step-by-step explanation:
Given data
Total number of students= 44
Number of students that picked vanilla= 33
Therefore the percentage that picked vanilla is
=44-33/44*100
=11/33*100
=0.3333*100
=33.33%
Hence the percentage is 33.33%
Which set of ordered pairs represents y as a function of x?
Answer:
D is the correct answer
Explanation:
the following function satisfies each output to its input for the set D
f(x)=x/2
let's check each pair:
0/2=0
-1/2=-0.5
-2/2=-1
-3/2=-1.5
-4/2=-2
the reason why A, B, and C can't be pairs of inputs and outputs x and y it's because a variable x can't have more than one y (that's a behaviour of an equation not a function!)
- in A x=-1 | y=2, -2 and this wrong
- in B x=3 | y=9, 16 and this wrong
- in C x=0 | y=0, 1 and this wrong
I hope this was helpful
A helicopter flew north 325 meters and then flew east 500 meters. How far is the helicopter from its starting point?
Answer:
596.34m approx
Step-by-step explanation:
Given data
Let the Starting point be x
A helicopter flew north 325 meters from x
Then flew east 500 meters
Let us apply the Pythagoras theorem to solve for the resultant which is the distance from the starting position
x^2= 325^2+500^2
x^2=105625+250000
x^2= 355625
x= √355625
x=596.34m
Hence the distance from the starting point is 596.34m approx
Hellohello, if you able to help me then please do. (:
Answer:
g=12
Step-by-step explanation:
3 + g = 15
g = 15-3
g = 12
I need help on this question I got 145.13 but i dont know what I did wrong
Answer:
145.12
Step-by-step explanation:
3.14 * 16 / 2 + 120
I basically got the same answer
I’m really confused can anyone help :(
Answer:
$75Step-by-step explanation:
1 dollar for every 1 ticket.
~~~~~~~~~~~~~~~~~~~~~~~~~~~`
Hope I helped!!!
GL :)
Answer: 75 the other guy is correct
Step-by-step explanation:
HELP I NEED HELP ASAP
HELP I NEED HELP ASAP
HELP I NEED HELP ASAP
HELP I NEED HELP ASAP
HELP I NEED HELP ASAP
Answer: a
Step-by-step explanation:
What is the area of the trapezoid?
Answer:
26 this is because 4x5=20 then add the triangle which is 3x4 ÷ 2 equalling 26
Answer:
Step-by-step explanation:
(5+8)/2 = 13/2 = 6.5
6.5*4 = 26m²
The formula for the area of a trapezoid is the same as a trapezium :
(a+b)/2 *h = Area
153 oz to ___lbs ____oz
Answer:
153 oz to 9.5625 lbs
Step-by-step explanation:
You can round 9.5625 lbs to 8 or just say 9.5
Maria is solving this number riddle by using guess and check: Fifteen less than a number is twelve.
Based on the riddle, which statements must be true? Check all that apply.
Answer:
27
Step-by-step explanation:
x-15=12
x=15+12
x=27
Answer:
27
Step-by-step explanation:
The radius of a circle is 4 centimeters. What is the area of a sector bounded by a 135 degrees arc?
Answer:
The answer is 0.235619449 rad m.
What is the area of a rectangular shaped yard enclosed by a fence that is 35 feet along the North side and 20 feet along the west side?
Answer:
700 ft
Step-by-step explanation:
35ft x 20ft = 700ft
In the triangle MSA, MS = 17 and MA = 8. What is the value of angle S, to the nearest degree?
Answer:
B. 28 degrees
Step-by-step explanation:
4) What is the probability to draw a black checker from a bag of 6 black
checkers and 4 red checkers, replacing it and drawing another black checker.
Step-by-step explanation:
Divide the number of events by the number of possible outcomes. This will give us the probability of a single event occurring. In the case of rolling a 3 on a die, the number of events is 1 (there's only a single 3 on each die), and the number of outcomes is 6.
In ΔMNO, the measure of ∠O=90°, NO = 1.8 feet, and OM = 3.6 feet. Find the measure of ∠M to the nearest tenth of a degree.
Answer:26.6
Step-by-step explanation:
delta math right ?
Which description can be written as the expression StartFraction 8 Over 21 n EndFraction?
Answer: It is the quotient of 21 times and number and 8.
Answer:
The answer is "A"
Step-by-step explanation:
please make me b r a i n l i e s t thx
Which number, when raised to the power of 5, equals 2?
Answer:
1.148698
Step-by-step explanation:
The number that will be equal to 2 when raised to the power of 5 is 1.1487.
When raising a particular number to the power of another, It implies that we are multiplying that particular number in the number of places with which the power is being raised.
From the given information:
Let the unknown number be x;SO;
x⁵ = 2We will need to determine the fifth root of 2 in order to eliminate the power of 5 in x.
i.e
[tex]\mathbf{ \sqrt[5]{x^5}=\sqrt[5]{2} }[/tex]
[tex]\mathbf{ x=\sqrt[5]{2} }[/tex]
x = 1.1487
Therefore, we can conclude that the number that will be equal to 2 when raised to the power of 5 is 1.1487.
Learn more about the square root here:
https://brainly.com/question/17309565?referrer=searchResults
Solve the equation:
3/4x = 12
Enter the answer in the box. Enter your numerical answer in the box, do not include words or spaces.
Answer:
3/4x=12
3=4x*12
3=48x
3/48x=1/16
x=1/16
PLZ SOMEONE HELP RIGHT AWAY!
10x+2(8x+10)
Answer:
26x+20
Step-by-step explanation: